.9%. To turn a decimal into a percent, you move the decimal 2 places to the right. So .009 would be .9%
Answer:
Cost, C = $28410.72
Step-by-step explanation:
We have, a concrete pillar has the shape of a cylinder.
Diameter of pillar is 8 m and ts height is 9 m
If concrete costs $87 per cubic meter, it is required to find the concrete cost for the pillar. For this lets find the area of cylindrical shape. So,

The cost of pillar at the rate of $87 per cubic meter will be :

Answer:
His actual score is 15
Step-by-step explanation:
Here, we are interested in calculating Wayne’s actual score on the ACT
when we say the scores have being standardized, it means the score was reported in terms of the z-score and not the initial raw scores.
Now, mathematically, for the scores to have a negative z-score, it means it is actually below the mean.
The formula for the z-score or standard score is given below;
z-score = (x - mean)/SD
where in this case, x = ? which is the score we are looking for , z-score = -0.5 , mean score = 18 and standard deviation of the scores = 6
So, substituting these values into the z-score equation, we have;
-0.5 = (x-18)/6
x-18 = 6(-0.5)
x -18 = -3
x = -3 + 18
x = 15
Answer: The pack of 20.
Step-by-step explanation:
It is because a pack of 20 sells for 2.50 for each pencil, and the pack of 12 sells for 2.51 per pencil, so that means the pack of 20 is cheaper.