1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Georgia [21]
3 years ago
8

One year there was a total of 73 commercial and noncommercial orbital launches worldwide. In​ addition, the number of noncommerc

ial orbital launches was one more than three times the number of commercial orbital launches. Determine the number of commercial and noncommercial orbital launches.
Mathematics
1 answer:
Schach [20]3 years ago
7 0
The were 24 commercial launches and and 49 non commercial
You might be interested in
Consider the trinomial 6x2 + 13x + 6.
attashe74 [19]
In the given expression 6X² + 13X +6, we can easily identify the values of a, b and c. These values are a=6, b=13 and c=6
For the value of "ac", we have:
ac=6*6
ac=36
For a sum of b are 4, we have
ac+b=36+13=49
Therefore, the answer for the last question "The two numbers that have a product of ac and a sum of b are 4 and 9".
8 0
3 years ago
Read 2 more answers
Please help . I’ll mark you as brainliest if correct!!!!!!
STatiana [176]

Answer:

3 are mushed

Step-by-step explanation:

You have 12 tomatoes

All but 9 get mushed

Total tomatoes = mushed + non mushed

12 = mushed +9

Subtract 9 from each side

12-9 = mushed+9-9

12-9 = mushed

3 = mushed

7 0
3 years ago
Read 2 more answers
Could I get some help PLEASE!!
kati45 [8]
Not similar, since the ratio of corespondent side is not constant
suppose ∆PRQ ~ ∆MRN, then RN/RP = RM/RQ but the reality contradict
4 0
3 years ago
McPhee Company manufactures rugs in the cutting and assembly process. Rugs are manufactured in 70-rug batch sizes. The cutting t
Vsevolod [243]

Answer:38 min

Step-by-step explanation:

Given

Cutting time t_1=14 min

Assembly Line time t_2=24 min

t_3=18 to move a batch of rugs from cutting to assembly

Value-added refers to a process or phase in a system that turns raw materials or work in progress into much more desirable goods and services for downstream consumers.

thus value added time is t_1+t_2=14+24 =38 min                

3 0
3 years ago
Help with proofs (10 points) please help will give brainliest
stiks02 [169]
1: e
2: d
3: g
4: c
5: a
6: i
7: h
8: f
i believe this is correct
3 0
3 years ago
Other questions:
  • In the Venn diagram, consider U = {whole numbers 1-100}
    13·2 answers
  • I need help
    7·2 answers
  • Match each verbal description to the equivalent function that fits the description.
    14·1 answer
  • During a baseball game a fly ball is hit to center field and is caught 115m
    8·1 answer
  • -3/2 multiplied by -5/1/4​
    13·2 answers
  • Use the table to answer the question. X y -21-1 -1 -1 1 0 3 1 5 2 7 Which equation represents the relationship between x and y s
    7·1 answer
  • Solve for x. Write the reasons next to each step.<br> (2x - 6)<br> (x + 40)
    10·1 answer
  • Which rule describes rotating 90° counterclockwise?
    9·1 answer
  • Has anyone done Exponential Growth and Decay (in mathematical models with application A) on sos or odysseware and gotten a prefe
    5·1 answer
  • the book fair had a sale where 6 book were $20.46 if you wanted to buy 7 books ,how much money would you need ?
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!