1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Arlecino [84]
3 years ago
11

What are the x and y intercepts for the graph of 4x - 3y = -12

Mathematics
2 answers:
vovangra [49]3 years ago
7 0

x intercept is where the line crosses the x axis or where y=0

y intercept is where the line crosses the y axis or where x=0

x intercept

set y=0

4x-3y=12

4x-3(0)=12

4x=12

divide by 4

x=3

the  x intercept is 3

y intercept

set x=0

4x-3y=12

4(0)-3y=12

-3y=12

divide by -3

y=-4

the y intercept is -4

Elanso [62]3 years ago
6 0
X is 3 y is -4 lololololol sorry for all this extra stuff it has 20 be 20 words to submit answer
You might be interested in
Please solve for 1,2 and 3
Maslowich

Answer:

1. 750/100

h=7.5 in

4 0
2 years ago
Please help me with this
Sunny_sXe [5.5K]
With what? Its nont showing anything.
7 0
4 years ago
Read 2 more answers
What is the fraction 3/2 squared in fraction form??
ehidna [41]
You basically just take 3^2 and 2^2 to get 9/4
9/4 is the answer

4 0
3 years ago
Read 2 more answers
Can some help me out with this EXTRA POINTS!!
Butoxors [25]

Answer: ≈ 185.73009

Step-by-step explanation:

area of square: length^{2}

area of circle: \frac{radius^{2} * \pi }{y}

length: 15

radius = diameter/2

radius: 5

area of square - area of circle =  area between square and circle:

15^{2} - \frac{5^{2} * \pi }{2} = 225 - \frac{25\pi}{2} ≈ 185.73009

hope it helps!

Please mark as brainliest.

8 0
2 years ago
200 labourers need 50 days to construct a road of 4 km long. How many labourers are needed to construct 8 km long in 80 days​
patriot [66]

Answer:

250

Step-by-step explanation:

Number of labourers * Number of days worked = Total number of working days

Total number of working days to construct a 4km long road: 200*50=10000

Total mumber of working days to construct a 8km long road: 10000*2=20000

Labourers: 20000 ÷ 80 = 250.

250 labourers are required.

7 0
3 years ago
Other questions:
  • If a five digit number is rounded to the ten thousands place is it possible for the rounded number to be a six digit number.
    15·1 answer
  • Complete the parts in each step to find the area of each trapezoid?
    13·1 answer
  • How many pounds of a 15% copper alloy must be mixed with 700lb of a 30% copper alloy to make a 25.5% copper alloy?
    8·1 answer
  • PLEASE HELP What is the slope of the line y=−4y
    14·1 answer
  • A game room has a floor that is 225 feet by 40 feet. A scale drawing of the floor on grid paper uses a scale of 2 units:5 feet.
    11·1 answer
  •   a right triangle has a hypotenuse that is 30 inches and a leg that is 15 inches. what is the length of the other leg rounded t
    8·2 answers
  • If y varies inversely as x and y=7 when x=−4, find y when x=2.
    15·1 answer
  • Consider the following triangle.
    12·1 answer
  • Gator Brews manufactures three types of brews: A, B, and C. These brews are produced via twa production processes: 1 and 2. Runn
    13·1 answer
  • Please help me with this
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!