The expression x-4 will come out to be a negative integer. That means X <em>has to be </em>something that when 4 is taken away from it, the answer is still negative.
Let's try 5.
5-4 is 1. Is 1 negative? No, so that doesn't work.
4-4 is 0. 0 isn't negative either, so that doesn't work.
3-4 is -1. Is -1 negative? YES! Let's try it for 2 as well, just to be safe.
2-4 is -2. Still negative.
X can be anything less than 4.
Answer:
540 degrees in a pentagon
4 + 8 + 6 + 4 + 5 = 27
540/27 = 20
4 X 20 = 80 degrees
8 X 20 = 160 degrees
6 X 20 = 120 degrees
4 X 20 = 80 degrees
5 X 20 = 100 degrees
Answer: x = 75
Explanation: Basically, the three angles of the triangle add up to 180 degrees. The bottom left angle is ninety degrees. (You can figure that out by looking at the symbol that looks like a square in the bottom left angle of the triangle.) If you see that in other problems it means that that angle equals 90 degrees. To find the bottom right angle, you take 165 and subtract it from 180 because the diagonal line intersects the line that is going horizontally. That would give you 15. You can check this by adding 15 and 165 and you know that you’re right if you get 180. That gives you two angles. As I said in the beginning, the three angles of the triangle should add up to 180. Now you have 90 degrees and 15 degrees. You add those two and you get 105. Now all you have to do is subtract 105 from 180. You should get 75. You can check if you get the right answer by adding 90, 15, and 75 together. If you get 180 then you are correct. If you don’t get 180 then you did something wrong and should do the problem again. Sorry for the long paragraph, I wanted to get all the details in in case you had any questions. :) Hope this helps.
Answer:
D
Step-by-step explanation:
Let the total production order be X. The combined rate is thus x/36 orders per hour.
Now, we know that the three machines are working at the same constant rate. This means that individual rate for each of the machines will be x/36 divided by 3 and that gives x/108 per machine.
Now, we are having another machine coming at the same constant rate. This means we are adding an x/108 rate to the preexisting x/36.
The new total rate thus becomes x/108 + x/36 = 4x/108
Now we know that the total new rate is 4x/108. Since the total work doesn’t change and it is still x, the time taken to complete a work of x orders at a rate of 4x/108 order per hour would be x divided by 4x/108 and this is x * 108/4x = 108/4 = 27 hours
Answer:
0033
Step-by-step explanation:
.033 of a whole number so its .033