Answer:
first do:
60mph * 4 hours= 240mi
Let D = the distance the passenger train has to
travel to catch the freight train
Start a stopwatch when the passenger train leaves
Let t = the time on the stopwatch when they meet
Equation for freight train:
d-240=60t
Equation for passenger train:
d=100t
all together:
100t-240=60t
we can do 100t-60t because they both have (t)= 40t
40t=240 *now divide 240 by 40= 6
THEN do:
D= 100mph x 6= 600mi
They will meet 600 mi from the station
to check:
d-240=60t x 6
600-240= 360
60 x 6= 360
360=360
Answer:
"The easiest way would be to turn the whole number into a fraction so for instance if the number was 2 it would become 16/8. You can then easily subtract 16/8 from 1/8 which would equal -15/8"(//answers.yahoo.com/).
Step-by-step explanation:
(//answers.yahoo.com/)
The concept that can be used in order to answer this item is that of man-days. The total number of man-days required to do the job should always be constant.
This can be illustrated by the givens above.
Scenario 1:
N1 = (4 employees)(4 days) = 16 man-days
Scenario 2:
N2 = (2 employees)(8 days) = 16 man-days
The equation for determining the value of e is equal to,
k = (d)(e)
The answer is the second choice.