1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
VLD [36.1K]
3 years ago
9

12. Which two numbers whose ratio is 3 to 2 have a sum of 35? PLEASE HELP ASAP!!

Mathematics
1 answer:
Brut [27]3 years ago
3 0

Answer:

14 and 21

Step-by-step explanation:

You should solve the following linear equations : \\\frac{x}{y} = \frac{3}{2}\\ x+y=35

You might be interested in
Find the gradient of the line <br><br> 3y + 2x = 1<br><br> how to guys
kykrilka [37]

Answer:

-2/3

Step-by-step explanation:

The gradient of a line is its slope. You can just convert the equation to slope-intercept form (y=mx+b where "m" is the gradient/slope):

3y + 2x = 1

3y = 1 - 2x

y = 1/3 - 2/3x

y = -2/3x + 1/3

So, as we can see, -2/3 is the gradient/slope of the line.

5 0
2 years ago
Scottie is standing next to a lighthouse on the edge of a cliff overlooking the ocean. The cliff is 30 meters above
Anit [1.1K]

a.

Scottie =  30

Top of the lighthouse =  45   (30+15)

The boat =  0

The fish = -10

b.

10 + 30 = 40

5 0
3 years ago
Read 2 more answers
60% of a number is 54. what is 50% of the same ?
tangare [24]

Answer:

The answer is 45.

Step-by-step explanation:

60% of a number is 54, find the original number

54 ÷ 60%

= 54 ÷ 60/100

= 54 * 100/60

= 90

50% of 90 is

90 * 50%

= 90 * 50/100

= 90 * 1/2

= 45

3 0
3 years ago
Beth had 1 yard of ribbon. she used 1/5 yard for a project. She wants to divide the rest of the ribbon into pieces 1/10 yard lon
likoan [24]
1 - (1/5) = 4/5 yards of ribbon.
(4/5) / (1/10) = 8 Pieces of 1/10 Yard Long Ribbons

Hope that Helped you.
4 0
3 years ago
Lilium Inc., an automobile company, estimates a total factory overhead cost of $1,500,000 for the year and an activity base of 2
Jobisdone [24]

Answer:

The applied factory overhead cost is $1,875,000

Step-by-step explanation:

Overhead cost = $1,500,000  at activity base of 200,000

We assume that the overhead is directly proportional to the activity base;

The cost per direct labor =  $1,500,000/200,000 = $7.5

Therefore at actual labor hours of 250,000, the factory overhead cost is therefore = $7.5 × 250000 = $1,875,000.

3 0
3 years ago
Other questions:
  • ALGEBRA 1 PLEASE HELP
    6·1 answer
  • A line that is parallel to y=2x-6
    6·1 answer
  • Area of 26 sq feet, length of 5 1/2, what is width
    15·2 answers
  • Special precision bolts are made by another machine. These are for jobs that require more exact measurements. The bolts must be
    12·1 answer
  • Yesterday Annie walked 9/10 mile to her friends house.together to he library which is the best estimate for how far Annie walked
    10·1 answer
  • !ANSWER FAST! <br><br> !ANSWER FAST!<br><br> !ANSWER FAST!
    12·2 answers
  • PLZ HELP AND SHOW UR WORK PLZZZZZZZZZ ;3
    14·1 answer
  • Andy buys a new car for $23,540. He estimates that the new car will decrease in value by about 5% each year. Which of the follow
    14·1 answer
  • What is the distance of the trip if Ken drives 7 hours at the speed of 65mph?
    6·2 answers
  • Which is the equation of the line with slope 0 passing through the<br> point (-3, 6)?
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!