First, we have
s1/r1 = s2/r2
The question also states the fact that
s/2πr = θ/360°
Rearranging the second equation, we have
s/r = 2πθ/360°
Then we substitute it to the first equation
s1/r1 = 2πθ1/360°
s2/r2 = 2πθ2/360°
which is now
2πθ1/360° = 2πθ2/360°
By equating both sides, 2π and 360° will be cancelled, therefore leaving
θ1 = θ2
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting
Answer:
1. No. it equals 24
2. Yes. it equals 18
3. Yes. it equals 90
4. No. it equals 44
Step-by-step explanation:
Answer:
WHAT IS THE VALUE THAT IT LOSES PER YEAR. OR EXPONENT.
Step-by-step explanation: