1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
GarryVolchara [31]
3 years ago
13

A professional football player signs a six-year 2.50 million dollar contract, with a guaranteed 30% increase per year if he make

s the All Pro team. If the player plays out the contract and makes the All Pro team each year, find the nth term of the geometric sequence that generates his annual salary and approximate his salary during the last year of his contract.
a 12.1 million dollars
b 9.28 million dollars
c 7.14 million dollars
d 9 million dollars
Mathematics
1 answer:
Sergeeva-Olga [200]3 years ago
4 0
<span>2.5*1.3^5=9.28 Million</span>
You might be interested in
Find the vertex and the axis of symmetry of the graph of the function?
Orlov [11]
3) Vertex: (-7, 0) Axis of Symmetry: x=-7
6) Vertex: (-2, -1) Axis of Symmetry: x=-2
5 0
4 years ago
reeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee
ladessa [460]

Answer:

RE÷EEEEEEEEEEEEEEEEEE

3 0
3 years ago
Please help ! <br><br> Determine the number of real solutions for each system .
alina1380 [7]

Answer:

cant help on a test sorry

Step-by-step explanation:

8 0
3 years ago
The number N of cars produced at a certain factory in 1 day after t hours of operation is given by Upper N (t )equals 800 t minu
Elden [556K]

Answer:

The cost C as a function of t is C(t) = 30,000 + 6,400,000 t - 40,000 t²

Step-by-step explanation:

The function N(t) = 800 t -  5t², represents the number of cars produced at a time t hours in a day, where 0 ≤ t ≤ 10

The function C(N) = 30,000 + 8,000 N, represents the cost C​ (in dollars) of producing N cars

We need to find The cost C as a function of the time t

That means Substitute N in C by its function by other word find the composite function (C о N)(t)

∵ C(N) = 30,000 + 8,000 N

∵ N(t) = 800 t - 5 t²

- Substitute N in C by 800 t - 5 t²

∴ C(N(t)) = 30,000 + 8000(800 t - 5 t²)

- Multiply the bracket by 8000

∴ C(N(t)) = 30,000 + 8000(800 t) - 8000(5 t²)

∴ C(N(t)) = 30,000 + 6,400,000 t - 40,000 t²

- C(N(t) = C(t)

∴ C(t) = 30,000 + 6,400,000 t - 40,000 t²

The cost C as a function of t is C(t) = 30,000 + 6,400,000 t - 40,000 t²

5 0
3 years ago
I got 25 so I wanted to know if I'm correct
kvasek [131]
I feel it should be 30 because x represents the number of lessons, and 30 is multiplied by that.
3 0
3 years ago
Read 2 more answers
Other questions:
  • Was is 29.15 as a mixed number in simplest form
    14·1 answer
  • Solve it (2⋅3) ^2−5 ^2=
    5·2 answers
  • Two digit number if you subtract my second digit from first the difference is 6. The product of my digits is 0
    13·1 answer
  • What number is in between 3.75 and 4.00?
    6·2 answers
  • A science fair poster is a rectangle 3 feet long and 2 feet wide. What is the area of the poster in square inches?
    8·1 answer
  • Estimate at 15% tip on a dinner bill of $39.84 by first rounding the bill amount to the nearest $10
    7·1 answer
  • One more than six times that number is 37. Select the solution and graph that represents the original number. x = 4 Point 4 grap
    12·1 answer
  • The perimeter of a rectangular parking lot is 296 m if the width of the parking lot is 65 m , what is its length
    5·2 answers
  • I confused can any body help me please...
    9·2 answers
  • Which expression has the greatest value? <br>1. -5-(-14)<br>2. -14-5<br>3. -14-(-5)<br>4. -5-14​
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!