1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Dennis_Churaev [7]
3 years ago
12

Area of a rectangular field is 2c^3-c^2+6 square units. If the length of the field is c-2 units, what is its width ?

Mathematics
1 answer:
Tema [17]3 years ago
6 0
If you just factor the original polynomial(The area) then you will find that one of the factors is c-2(the length) and the other will be the width.
When I factored it, I got 2c+3 as the width.
:)
You might be interested in
The graph below shows the path of a model rocket after its launch from the ground.
Zarrin [17]
The answer the third one
8 0
2 years ago
{UNIT RATES} A punch recipe calls for 2/3 of a pint of fruit juice for each pint of soda.
Naily [24]
The ratio of soda to fruit juice in the punch is 1 to 2/3
3 0
3 years ago
Read 2 more answers
The A&M Hobby Shop carries a line of radio-controlled model racing cars. Demand for the cars is assumed to be constant at a
Bond [772]

Answer:

Step-by-step explanation:

A) Demand per month= 40 cars

Annual Demand (D)= 12*40 = 480

Fixed Cost per order (K)= 15

Holding Cost= 20% of cost= 60 *0.2 = 12

a. Economic Order Quantity=

Q^{*}={\sqrt {{\frac {2DK}{h}}}}

= √(2*480*15)/12

=34.64 ~ 35

Total Cost =P*D+K(D/EOQ)+h(EOQ/2) P= Cost per unit

= 60*480+ 15(480/35) + 12(35/2)

= 28800+ 205.71+ 210

=$29215.71

B). Backorder Cost (b)= $45

Qbo= Q* × √( b+h/ h)

= 35*√(12+45/ 45)

= 35* 1.12

=39.28 ~ 39

Shortage (S)= Qbo * (K/K+b)

= 39* (15/15+45)

= 39* 0.25

= 9.75

Total Cost Minimum=( bS2/ 2Qbo) + P (Qbo- S)2/2Qbo + K(D/Qbo)

=45* 9.752 / 2* 392 + 60 (39-9.75)2/ 2* 392 + 15 ( 480/39)

= 1.40+ 21.9.+ 184.61

=$207.91

C)Length of backorder days (d) = Demand ÷ amount of working days

d = 480 ÷ 300

d = 1.6

Calculate the backorders as the maximum number of backorders divided by the demand per day

s/d = 9.75/1.6 = 6.09 days (answer)

D) Calculate the difference in total between not using backorder:

$207.85 + $207.85 - 207.91 = $207.79

The saving in using backorder is $207.79.

Therefore I would recommend using a backorder

6 0
2 years ago
(-4, 8) and (6, 2). Slope
Setler79 [48]

Answer:

In order to go from the first point to the second, we need to rise from 4 to 7, i.e. by 3. We also need to run from -4 to -2, i.e. by 2. Therefore the slope is 32 .

Step-by-step explanation:

8 0
2 years ago
If the flare is launched with an initial velocity of 144 feet per second, find the height after 2 seconds. The answer is not 288
Rashid [163]
H= ut -16 t^2

h = 144(2) - 16 (4)

= 288 - 64 = 224
4 0
3 years ago
Other questions:
  • Write down the quadratic equation whose roots are $x = -7$ and $x = 1,$ and the coefficient of $x^2$ is 1. Enter your answer in
    6·1 answer
  • PLEASE HELP,I AM BEING TIMED!!<br> Measure the angle of 2<br><br> Options: 100<br> 120<br> 30<br> 60
    13·2 answers
  • Select me correct answer.
    13·2 answers
  • Yul has lunch at a resterant if his bill was $14.50 and yul wants to leave a 20% tip what is the amount he should leave for the
    11·1 answer
  • You earn $20.00 per hour at your job. If you get a 10% raise at the end of each year, what will your hourly rate, h, be after 8
    15·1 answer
  • A. vertical angles<br> b. complementary angle<br> c. supplementary angle<br> d. none of the above
    8·1 answer
  • -6 + (-2) + 5= ? <br><br> Help would really be appreciated!! :)
    12·2 answers
  • Find the Ares of a semi circle whose radius is 2.4 cm​
    11·2 answers
  • (x <br> 3<br> +y <br> 3<br> )(xy <br> 4<br> +7)
    10·1 answer
  • Pls help it's due today​
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!