1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
cestrela7 [59]
3 years ago
6

Precast double-tee units are generally used as structural floors when:________.

Engineering
1 answer:
TiliK225 [7]3 years ago
8 0

Answer:

<em>d. floor spans exceed that which is economical with site-cast or hollow-core slabs and exceed 60 feet.</em>

<em></em>

Explanation:

<em> Double tee slabs are prestressed concrete castings usually about 100 m to 150 m long</em>. <em>They are usually used in the construction industry in structures requiring a long floor span (or roof span) exceeding 60 feet in length, that is required to bear additional load (additional load carrying capability</em>). Double tee slabs are usually employed in construction because they shorten construction time. reduce congestion at the construction site, and also reduce construction cost.

<em>They are the required choice in construction when the cost of site casting or hollow-core slabs is no longer economical due to the length of the structure exceeding 60 feet.</em>

You might be interested in
Which of the following elements of the CIA triad refers to maintaining and assuring the accuracy of data over its life-cycle?
kenny6666 [7]

Answer:

Integrity: involves maintaining and assuring the accuracy of data over its life-cycle

Explanation:

Confidentiality: This is a CIA triad designed to prevent sensitive information from reaching the wrong people, while making sure that the right people have access to it.

Integrity: This is a CIA triad that involves maintaining the consistency, accuracy, and trustworthiness of data over its entire life cycle.

Availability: This is a CIA triad that involves hardware repairs and maintaining a correctly functioning operating system environment that is free of software conflicts.

Authentication:This is a security control that is used to protect the system with regard to the CIA properties.

4 0
3 years ago
Sketches are a very efficient way to share ideas.<br> True<br> False
timurjin [86]

Answer:

yes

Explanation:

4 0
3 years ago
Read 2 more answers
A(n) ______ is used to measure fluid flow in engineering
Arte-miy333 [17]

Answer:

A pitot tube is used to measure fluid flow in engineering

3 0
2 years ago
Which of the following might be a job or task of an IT worker who manages
-Dominant- [34]

Answer:

I'm pretty sure it's letter d

7 0
3 years ago
Consider a cubic block whose sides are 6 cm long and a cylindrical block whose height and diameter are also 6 cm. both blocks ar
bija089 [108]

Answer:

Check the explanation

Explanation:

Kindly check the attached image below to see the step by step explanation to the question above.

5 0
3 years ago
Other questions:
  • A gas stream contains 4.0 mol % NH3 and its ammonia content is reduced to 0.5 mol % in a packed absorption tower at 293 K and 10
    14·1 answer
  • Technician A says a basic circuit problem can be caused by something in the circuit that increases voltage. Technician B says a
    8·1 answer
  • Which statement about direct-mail messages is most accurate? Group of answer choices Direct mail is an effective channel for per
    15·1 answer
  • Consider the following program:
    15·1 answer
  • The solid cylinders AB and BC are bonded together at B and are attached to fixed supports at A and C. The modulus of rigidity is
    6·1 answer
  • Interlocking stacked material is done by​ _____.
    10·2 answers
  • The following is a list of metals and alloys:
    10·1 answer
  • A well-insulated tank in a vapor power plant operates at steady state. Saturated liquid water enters at inlet 1 at a rate of 125
    8·1 answer
  • By using order of magnitude analysis, the continuity and Navier-Stokes equations can be simplified to the Prandtl boundary-layer
    9·1 answer
  • The design-bid-build model is prons to abuse because separation of phases facilitates the hiding of corrupt practices.
    7·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!