Answer:
1. $0.80 or 80 cents
2. 1.25 meters
Step-by-step explanation:
The equation p=0.8L represents the price p (in dollars) of a piece of nylon rope that is L meters long.
1. To find how much the nylon costs per meter, take L = 1 (this means you are calculating the price of a piece of nylon rope that is 1 meter long):

2. To find how long a piece of nylon rope that costs $1.00 is, substitute into the equation p = 1:

$2.65
You can get this by subtracting the 7.35 from the 10.
10 - 7.35 = 2.65
Answer: 5%
Step-by-step explanation:
The number of employees that took Winter vacation = 75%
The number of employees that took Both winter and summer vacation = 40%
The number that took Neither = 20
The total number of employees (%) =Winter + Summer - Both + Neither = 100%
75%+ Summer - 40%+ 20%= 100%
Solving for Summer = 45%
Now we are interested in the employees that took summer but not winter = Summer only = Summer - Both(i.e. summer overlap with winter) = 45%-40%= 5%
Answer:
angle-side-angle. that's my answer