Answer:
12.5J
Explanation:
Given parameters:
Mass of bucket = 1.7kg
Height = 75cm = 0.75m
Unknown;
Work done on the bucket by the person = ?
Solution:
To solve this problem, we use the work done equation;
Work done = force x distance = mgh
m is the mass
g is the acceleration due to gravity
h is the height
Now, insert parameters and solve ;
Work done = 1.7 x 9.8 x 0.75 = 12.5J
Answer:
the diameter of the second pipe is 2.52 in
Explanation:
Given the data in the question;
We know that; the rate of flow is the same;
so
Av1 = Av2
v ∝ √h
= 
= √(
)
( π/4.D1² / π/4.D2² ) = √(
)
( D1² / D2² ) = √(
) since second is double of first
so
( D1² / D2² ) = √(
)
3² / D2² = √2
D2²√2 = 9
D2² = 9/√2
D2² = 9 / 1.4142
D2² = 6.364
D2 = √ 6.364
D2 = 2.52 in
Therefore, the diameter of the second pipe is 2.52 in
I think the answer is Resistance. If the link i posted int he comment is right.
Answer:
t= 24080 s
Explanation:
Given that
Current in the wire ,I = 4 A
The charge ,q = 6.02 x 10²³ e C
We know that

I=Current
q=Charge
t=time

Now by putting the values in the above equation we get'

t= 24080 s
Answer:
Explanation:
Coordinate system is one that describe the location of an object in a given plane. It implies the use of axes (coordinates) and points.
Given that the man in the question walks 400 m due north of east. The cardinal points can be used in this case, with the north and east cardinals as the required axis.
scale = 
= 
= 
scale = 1:40
This is a reduced scale which implies that 1 cm on the drawing is equal to 40 m on the original length.
The man's direction is
north of east.
The graphical drawing of the vector is herewith attached to this answer.