Answer:
The equation of the line is y =
x + 2
Step-by-step explanation:
The form of the equation that passes through two points (x1, y1) and (x2, y2) is y = m x + b, where
- m is the slope of the line whose rule is
- b is the y-intercept, you can find it by substituting x, y in the equation by (x1, y1) OR (x2, y2)
Let us solve the question:
∵ The line passes through the points (-3, -2) and (3, 6)
∴ x1 = -3 and x2 = 3
∴ y1 = -2 and y2 = 6
→ Use the rule of m to find it
∵ 
→ Simplify it by dividing up and down by 2
∴ m = 
→ Substitute its value in the form of the equation above
∴ y =
x + b
→ To find b substitute x and y by x1 and y1
∴ -2 =
(-3) + b
∴ -2 = -4 + b
→ Add 4 to both sides
∴ -2 + 4 = -4 + 4 + b
∴ 2 = b
→ Substitute it in the form of the equation
∴ y =
x + 2
∴ The equation of the line is y =
x + 2
Answer:
11 Students
Step-by-step explanation:
It is hard to explain in my opinion but I can try. For the stem column you, basically factor out the first digit of the number. Then the leaf column you, put the second digit of each number in your data set.
Answer:
y = 1/4 x - 2
Step-by-step explanation:
To write the equation of a line, find from the line the slope and y-intercept. The y-intercept is where the line crosses the y-axis which here is at point (0,-2).
The slope of the line is found by writing a ratio between the vertical distance and the horizontal distance between points.
Slope is 1/4.
Substitute m = 1/4 and b = -2 into the slope intercept form y = mx + b.
y = 1/4 x - 2
Answer:
96.6
Step-by-step explanation:
We know that the Area of the rectangle is,
A =Length x width
So the Area of the wall painted by Wendy will be,
A = 10.5 x 9.2 = 96.6
So; the area painted by Wendy will be <em><u>96.6 square feet</u></em>.
-Mark me brainliest and a 5 star :D
Answer:
10 pages per technician per day is the unit metric for the production work.
Step-by-step explanation:
Consider the provided information.
Stiviko's approved work plan included 4 technicians to create 200 web pages over 5 days.
They can create 200 web pages over 5 days.

That means in one day they can create 40 pages.
There are 4 technicians who work, therefore the unit metric for the production work is: 
Hence, 10 pages per technician per day is the unit metric for the production work.