I believe you meant "why is the number of shifts multiplied by approximately 4.5 to obtain the total number of operators required to run the plant"
Answer and Explanation:
There are 3 shifts per day, 49 weeks per year and 5 shifts per operator per week
To get total number of operators required to run the plant, we multiply number of shifts in a year by number if operators per shift.
49 weeks×5 shifts= 245 shifts per operator per year
365×3 shifts= 1095 shifts per year
1095/245=4.5 operators per shift
total number of operators required to run the plant(per day) = 4.5×3= 13.5 approximately 14
total number of operators required to run the plant(per year) =4.5×1095=4927.5 approximately 4928
Answer:
Step-by-step explanation:
S=student cost; T=teacher cost
.
32S+3T=$127 . Multiply this by 2.
64S+6T=$254 Subtract this below
.
25S+2T=$97.50 . Multiply this by 3.
75S+6T=$292.50
64S+6T=$254 . Subtract this (from above.)
.
11S=$38.50
S=$3.50
ANSWER 1: Student tickets cost $3.50.
.
32S+3T=$127
32($3.50)+3T=$127
$112+3T=$127
3T=$15
T=$5.00
ANSWER 2: Teacher tickets cost $5.00.
.
CHECK:
25S+2T=$97.50
25($3.50)+2($5.00)=$97.50
$87.50+$10.00=$97.50
$97.50=$97.50
Step-by-step explanation:
option C is the correct answer of this question
Answer:
0 degrees
Step-by-step explanation:
when it is hour 12 and 0 minutes, the hour and minute hand will be on top of each other, so therefore it does not form an angle
Answer:D is 0,-5
Step-by-step explanation: