<span>All the information we have are the probabilities, and what we need is the lowest number: so let's choose the smallest probability among the numbers: 0.0065%, B 0.0037%,C 0.0108%,D 0.0029%, E 0.0145%. The smallest of the numbers is 0.0029% -it starts with two 00s and the number that follows, 2, is smaller than all there others - so the smallest probability is in option D - and the model would be the corresponding model (but we're missing some information here) </span>
There can be no negative in a sqrt
so x+1 must be equal or greater then 0
x+1

0
x

-1
so all answers must be greater then or equal to -1
-1,0,1,2,3,4,5,6,7,8
(-1,infinity) is the domain
The answer would be X = 15
Answer:
Unit rate in metric tons per hour = 1.17
Explanation:
A construction company can remove 5 1/4 metric tons of dirt from a construction site in 4 1/2 hours.
Dirt removed 
Time taken in hours 
Unit rate in metric tons per hour = Dirt removed in metric tons/ Time taken in hours for that.
Unit rate in metric tons per hour
Answer:
(5+3) times 2 then that would be 16
Step-by-step explanation:
You are just multiplying everything inside of the Parentheses after you add them together.
Here is an easy way to remember the order of operation:
PEMDAS
Parentheses
Exponents
Multiplication
Division
Addition
Subtraction
Hope that helps