Local min:(-1.25,-16),,,,,(2.5,-3)
local max:(1,4)
I believe you meant "why is the number of shifts multiplied by approximately 4.5 to obtain the total number of operators required to run the plant"
Answer and Explanation:
There are 3 shifts per day, 49 weeks per year and 5 shifts per operator per week
To get total number of operators required to run the plant, we multiply number of shifts in a year by number if operators per shift.
49 weeks×5 shifts= 245 shifts per operator per year
365×3 shifts= 1095 shifts per year
1095/245=4.5 operators per shift
total number of operators required to run the plant(per day) = 4.5×3= 13.5 approximately 14
total number of operators required to run the plant(per year) =4.5×1095=4927.5 approximately 4928
Answer:
x = 3.86
a = 5.86
Step-by-step explanation:
From the triangles attached,
By applying cosine rule in triangle 1,
cos(50)° = 
cos(50)° = 
x = 6cos(50)°
x = 3.86
Now we apply sine rule in the second triangle,
sin(23)° = 
sin(23)° = 
a = 15sin(23)°
a = 5.86
Answer:
C. X=6
Step-by-step explanation:
Length of one side =52/4= 13
3X-5= 13
3x = 13+5
X= 18/3
X= 6
Answer:
the answer is a.
Step-by-step explanation: