The interval notation is
Explanation:
The inequality is
Let us complete the square, we get,
Simplifying, we have,
Adding both sides of the equation by 11, we get,
Since, we know that for , if n is even then
Thus, writing the above expression in this form, we get,
Also, if then and
Then ,we have,
and
Solving the inequalities, we get,
and
Merging the intervals, we have,
Hence, writing the solution in interval notation, we have,
Therefore, the answer is
Answer:
Step-by-step explanation:
1.
2.
3. divide both sides by 7
4.
Closed circle on -1 and the line goes to the left
Answer:
the least required speed is 103.88 km/h
Step-by-step explanation:
Data provided in the question:
Total distance = 270 km
Total time to reach = Time between 8 a.m and 11:15 a.m i.e 3.25 hours
Now,
For the distance of 110 km speed was 100 km/h
therefore, the time taken to cover 110 km =
=
= 1.1 hour
For another 43 km speed was 42 km/h
therefore, the time taken to cover 43 km =
=
= 1.0238 hours
Now,
The distance left to be covered = 270 - 110 - 43 = 117 km
Time left = 3.25 h - 1.1 h - 1.0238 h = 1.1262 h
Thus required speed =
= 103.88 km/h
Hence, the least required speed is 103.88 km/h
slope: 4/5 is a positive slope
- positive slopes rises from left to right
- positive slopes falls from right to left
- neither horizontal or vertical.
The picture below shows some examples of <u>equation with positive slope</u>.
These drawings depict the steps to get the perpendicular line using a compas (and maybe a ruler)
remember that a line goes through 2 points so we need 2 different points to construct our perpendicular line
the first one is wrong because it doesn't constraint it to be perpendicular
it only has 1 point,
2nd is wrong as well, has only 1 point, the center
3rd is right
4th is correct, hold a sec
how did that 2nd upper arc have same beginig pointn for compass?
3rd on is answer