Answer:
$10.00 per hour
Step-by-step explanation:
Overhead application rate which is also known as overhead absorption rate on the basis on labor hours is the total budgeted overhead for 2019 which is $900,000 divided by the expected production of 90,000 labor hours for the year.
overhead application rate=$900,000/90,000=$10 per hour
This implies that for every one hour worked overhead cost of $10 would be added to the other costs incurred.
The correct option then is the third option of $10.00 per hour
Answer:
C. 28 ft³
Step-by-step explanation:
The general formula for the volume of a pyramid:
V =
, where B = the area of the base and h = height of the pyramid
Since the base is a rectangle, we can find area using the formula:
A = l x w or A = 3 x 4 = 12 ft²
Using B = 12 and h = 7:
V = 
V = 28 ft³
Answer:
yellow fabric 5/3 yards
Step-by-step explanation:
convert the mixed numbers into improper fractions:
3 2/3 = 11/3 5 1/3=16/3
16/3 - 11/3 = 5/3
Answer:
Positive steady ncreasing slope!!