1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
tatyana61 [14]
3 years ago
9

A drilling operation is performed on a steel part using a 12.7 mm diameter twist drill with a point angle of 118 degrees. The ho

le is a blind hole with a depth of 50 mm. Cutting speed=15 m/min, and feed=0.20 mm/rev.
Determine the following:

a. Rotational speed of the drill
b. Feed rate
c. Approach allowance
d. Cutting time
e. Metal removal rate after the drill bit reaches full diameter.
Engineering
1 answer:
Masteriza [31]3 years ago
7 0

Answer:

a. Rotational speed of the drill  = 375.96 rev/min

b. Feed rate  = 75 mm/min

c. Approach allowance  = 3.815 mm

d. Cutting time  = 0.67 minutes

e. Metal removal rate after the drill bit reaches full diameter. = 9525 mm³/min

Explanation:

Here we have

a. N = v/(πD) = 15/(0.0127·π) = 375.96 rev/min

b. Feed rate = fr = Nf = 375.96 × 0.2 = 75 mm/min

c. Approach allowance = tan 118/2 = (12.7/2)/tan 118/2 = 3.815 mm

d. Approach allowance T∞ =L/fr = 50/75 = 0.67 minutes

e. R = 0.25πD²fr = 9525 mm³/min.

You might be interested in
Select the properties and typical applications for the high carbon steels.
yanalaym [24]

Answer:

<u>Option-(A)</u>

Explanation:

<u>Typical applications for the high carbon steels includes the following;</u>

It is heat treatable, relatively large combinations of mechanical characteristics. Typical applications: railway wheels and tracks, gears, crankshafts, and machine parts.

3 0
3 years ago
Pedro holds a heavy science book over his head for 10 minutes. Petro is doing work during that time. True or False
algol [13]

Answer:

True because he is working his arms to lift and hold the weight

Explanation:

4 0
3 years ago
A biotechnology company produced 225 doses of somatropin, including 11 which were defective. Quality control test 15 samples at
Radda [10]

Answer:

  • <u>0.59</u>

Explanation:

The <em>batch</em> is <em>rejected</em> if any of the <em>random samples are found defective</em>, or, what is the same, it will be accepted only if all 15 samples are good.

The probability that none be defective is the same probability that all the samples are good. Thus, start to calculate the probability that the batch is accepted.

The probability that the first sample is good is 214 /225, because there are 225 - 11 = 214 good samples in 225 doses.

The probability that the second samples is good too is 213/224, because there is 1 less good sample, in the 224 remaining samples.

By the same process, you conclude that the consecutive probabilities of selecting a good sample are: 212/223, 211/222, 210/221, . . . up to 199/211.

The joint probability of all the samples are good is the product of each probability:

\frac{214}{225}\cdot\frac{213}{224}\cdot\frac{212}{223}\cdot\frac{211}{222}\cdot\frac{210}{221}\cdot\frac{209}{220}\cdot\frac{208}{219}\cdot\frac{207}{218}\cdot\frac{206}{217}\cdot\frac{205}{216}\cdot\frac{204}{215}\cdot\frac{203}{214}\cdot\frac{202}{213}\cdot\frac{201}{212}\cdot\frac{200}{211}\cdot\frac{199}{210}

The result is: 0.41278 ≈ 0.41

The conclusion is that the probability that all the samples are good and the batch is accepted is 0.41.

Therefore, <em>the probability that the batch is rejected</em> is 1 - 0.41 = 0.59.

4 0
3 years ago
Products that are in the process of being manufactured but are not yet complete are called:
vazorg [7]

Answer:

Those products are generally called Work in Process WIP

Explanation:

Work in process (WIP), or work in progress (WIP), goods in process, or in-process inventory in a manufacturing industry/company refer to the company's partially finished goods waiting for completion and eventual sale or the value of these items.

These items are either just being produced or require further processing (like purification, separation, packaging or handling) in a queue or a buffer storage.

6 0
3 years ago
A segment of four-lane freeway (two lanes in each direction) has a 3% upgrade that is 1500 ft long followed by a 1000-ft 4% upgr
Dennis_Churaev [7]

Answer:

The level of service of of compound grade freeway is LOSB.

Explanation:

Find the provided attachments for explanation

3 0
3 years ago
Other questions:
  • What is something that a robot or computer program might do that requires a decision, or conditional statement?
    9·1 answer
  • You live on a street that runs East to West. You just had 2 inche of snow and you live on the North side of the street. You retu
    14·1 answer
  • Required information NOTE: This is a multi-part question. Once an answer is submitted, you will be unable to return to this part
    9·1 answer
  • 3–102 One of the common procedures in fitness programs is to determine the fat-to-muscle ratio of the body. This is based on the
    5·1 answer
  • Create a project named CarDealer that contains a Form for an automobile dealer. Include options for at least three car models. A
    14·1 answer
  • What are the desired characteristics or values for the following parameters of an ideal amplifier?o Phase change as a function o
    10·1 answer
  • calculate the magnitude of the force acting on the pin at D. Pin C is fixed in DE and bears against the smooth slot in the trian
    9·1 answer
  • A 250 kilo ohms and a 750 kilo ohms resistor are connected in series across a 75-volt source. Determine the error in measuring t
    10·1 answer
  • Aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
    9·1 answer
  • Name eight safety electrical devices including their functions and effects if not present.​
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!