Work needed = 23,520 J
<h3>
Further explanation
</h3>
Given
height = 12 m
mass = 200 kg
Required
work needed by the crane
Solution
Work is the transfer of energy caused by the force acting on a moving object
Work is the product of force with the displacement of objects.
Can be formulated
W = F x d
W = Work, J, Nm
F = Force, N
d = distance, m
F = m x g
Input the value :
W = mgd
W = 200 kg x 9.8 m/s²x12 m
W = 23520 J
Explanation:
Initial energy = final energy + work done by friction
PE = PE + KE + W
mgH = mgh + 1/2 mv² + W
(800)(9.8)(30) = (800)(9.8)(2) + 1/2 (800) v² + 25000
v = 22.1 m/s
Without friction:
PE = PE + KE
mgH = mgh + 1/2 mv²
(800)(9.8)(30) = (800)(9.8)(2) + 1/2 (800) v²
v = 23.4 m/s
Answer:
The value is 
Explanation:
From the question we are told that
The operating temperature is 
The emissivity is 
The power rating is 
Generally the area is mathematically represented as

Where
is the Stefan Boltzmann constant with value

So


That depends on where you weigh it.
-- On Earth, it weighs 9.807 newtons (2.205 pounds).
-- On the moon, it weighs 1.623 newtons (5.84 ounces).
-- On Jupiter, it weighs 24.79 newtons (5.57 pounds).
BTW ... 1,000 grams of mass is called ' one kilogram '.