1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Oliga [24]
4 years ago
5

(a) Show how two 2-to-1 multiplexers (with no added gates) could be connected to form a 3-to-1 MUX. Input selection should be as

follows: If AB = 00, select I0 If AB = 01, select I1 If AB = 1− (B is a don’t-care), select I2 (b) Show how two 4-to-1 and one 2-to-1 multiplexers could be connected to form an 8-to-1 MUX with three control inputs. (c) Show how four 2-to-1 and one 4-to-1 multiplexers could be connected to form an 8-to-1 MUX with three control inputs

Engineering
1 answer:
Llana [10]4 years ago
5 0

Answer:

Explanation:

a) Show how two 2-to-1 multiplexers (with no added gates) could be connected to form a 3-to-1 MUX. Input selection should be as follows: If AB = 00, select I0 If AB = 01, select I1 If AB = 1− (B is a don’t-care), select I2

We are to show how Two-2-to -1 multiplexers could be connected to form 3-to-1 MUX

If AB = 00 select I_o

If AB = 01 select I_1

If AB = 1_(B is don't care), select I_2

However, the truth table is attached and shown in the first file below.

Also, the free- body diagram for 2- to - 1 MUX is shown in the second diagram attached below.

b) We are show how  two 4-to-1 and one 2-to-1 multiplexers could be connected to form an 8-to-1 MUX with three control inputs.

The perfect illustration showing how they are connected in displayed in the third free-body diagram attached below.

Where ; I_o , I_1, I_2, I_3, I_4, I_5, I_6, I_7 are the inputs of the multiplexer and Z is the output.

c)  Show how four 2-to-1 and one 4-to-1 multiplexers could be connected to form an 8-to-1 MUX with three control inputs.

For  four 2-to-1 and one 4-to-1 multiplexers could be connected to form an 8-to-1 MUX with three control inputs, we have a perfect illustration of the diagram in the last( which is the fourth) diagram attached below.

Where ; I_o , I_1, I_2, I_3, I_4, I_5, I_6, I_7 are the inputs of the multiplexer and Z is the output

You might be interested in
In plane stress, a prismatic bar of constant cross-section has an infinite length. a) True b) False
Law Incorporation [45]

Answer:

Option b) False

Explanation:

The given statement for a prismatic bar having constant area of cross section

is not correct and hence False as the length of the bar is not infinite.

The length of the prismatic bar must be very large in comparison to the thickness and width of the bar but has finite length and is not infinite.

Therefore, the correct statement is:

"In plane stress, a prismatic bar with constant area of cross section has finite length."

8 0
3 years ago
A particular NMOS device has parameters VT N = 0.6 V, L = 0.8µm, tox = 200 Å, and µn = 600 cm2 /V–s. A drain current of ID = 1.2
NeTakaya

Answer:

W= 3.22 \mu m

Explanation:

the transistor In saturation drain current region is given by:

i_D}=K_a(V_{GS}-V_{IN})^2

Making K_a the subject of the formula; we have:

K_a=\frac {i_D} {(V_{GS} - V_{IN})^2}

where;

i_D = 1.2m

V_{GS}= 3.0V

V_{TN}  = 0.6 V

K_a=\frac {1.2m} {(3.0 - 0.6)^2}

K_a = 208.3 \mu A/V^2

Also;

k'_n}=\frac{\mu n (\frac{cm^2}{V-s} ) \epsilon _{ox}(\frac{F}{cm} ) }{t_{ox}(cm)}

where:

\mu n (\frac{cm^2}{V-s} ) = 600

\epsilon _{ox}=3.9*8.85*10^{-14}

{t_{ox}(cm)=200*10^{-8}

substituting our values; we have:

k'_n}=\frac{(600)(3.988.85*10^{-14})}{(200*10^{-8})}

k'_n}=103.545 \mu A/V^2

Finally, the width can be calculated by using the formula:

W= \frac{2LK_n}{k'n}

where;

L = 0.8 \mu m

W= \frac{2*0.8 \mu m *208.3 \mu}{103.545 \mu}

W= 3.22 \mu m

4 0
4 years ago
Is an ideal way for a high school student to see what an engineer does on a typical day but does not provide a hands-on experien
lys-0071 [83]

Answer:

Look at some engineering colleges and set up or join a public zoom meeting. For example, some colleges have sign ups for zoom calls on set dates and you‘re able to ask questions.

Explanation:

8 0
3 years ago
Read 2 more answers
What are the four basic parts of process plan
Rus_ich [418]

Answer:

1. Goal setting

2. Developing the planning premises

3. Reviewing Limitations

4. Deciding the planning period

5. Formulation of policies and strategies

6. Preparing operating plans

7. Integration of plans

Explanation:

I don't have an explanation but i thru in a few extra answers for like extra credit or something if your teacher does that

8 0
3 years ago
Three tool materials (high-speed steel, cemented carbide, and ceramic) are to be compared for the same turning operation on a ba
Tpy6a [65]

Answer:

Among all three tools, the ceramic tool is taking the least time for the production of a batch, however, machining from the HSS tool is taking the highest time.

Explanation:

The optimum cutting speed for the minimum cost

V_{opt}= \frac{C}{\left[\left(T_c+\frac{C_e}{C_m}\right)\left(\frac{1}{n}-1\right)\right]^n}\;\cdots(i)

Where,

C,n = Taylor equation parameters

T_h =Tool changing time in minutes

C_e=Cost per grinding per edge

C_m= Machine and operator cost per minute

On comparing with the Taylor equation VT^n=C,

Tool life,

T= \left[ \left(T_t+\frac{C_e}{C_m}\right)\left(\frac{1}{n}-1\right)\right]}\;\cdots(ii)

Given that,  

Cost of operator and machine time=\$40/hr=\$0.667/min

Batch setting time = 2 hr

Part handling time: T_h=2.5 min

Part diameter: D=73 mm =73\times 10^{-3} m

Part length: l=250 mm=250\times 10^{-3} m

Feed: f=0.30 mm/rev= 0.3\times 10^{-3} m/rev

Depth of cut: d=3.5 mm

For the HSS tool:

Tool cost is $20 and it can be ground and reground 15 times and the grinding= $2/grind.

So, C_e= \$20/15+2=\$3.33/edge

Tool changing time, T_t=3 min.

C= 80 m/min

n=0.130

(a) From equation (i), cutting speed for the minimum cost:

V_{opt}= \frac {80}{\left[ \left(3+\frac{3.33}{0.667}\right)\left(\frac{1}{0.13}-1\right)\right]^{0.13}}

\Rightarrow 47.7 m/min

(b) From equation (ii), the tool life,

T=\left(3+\frac{3.33}{0.667}\right)\left(\frac{1}{0.13}-1\right)\right]}

\Rightarrow T=53.4 min

(c) Cycle time: T_c=T_h+T_m+\frac{T_t}{n_p}

where,

T_m= Machining time for one part

n_p= Number of pieces cut in one tool life

T_m= \frac{l}{fN} min, where N=\frac{V_{opt}}{\pi D} is the rpm of the spindle.

\Rightarrow T_m= \frac{\pi D l}{fV_{opt}}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 47.7}=4.01 min/pc

So, the number of parts produced in one tool life

n_p=\frac {T}{T_m}

\Rightarrow n_p=\frac {53.4}{4.01}=13.3

Round it to the lower integer

\Rightarrow n_p=13

So, the cycle time

T_c=2.5+4.01+\frac{3}{13}=6.74 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times6.74+\frac{3.33}{13}=\$4.75/pc

(e) Total time to complete the batch= Sum of setup time and production time for one batch

=2\times60+ {50\times 6.74}{50}=457 min=7.62 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times4.01}{457}=0.4387=43.87\%

Now, for the cemented carbide tool:

Cost per edge,

C_e= \$8/6=\$1.33/edge

Tool changing time, T_t=1min

C= 650 m/min

n=0.30

(a) Cutting speed for the minimum cost:

V_{opt}= \frac {650}{\left[ \left(1+\frac{1.33}{0.667}\right)\left(\frac{1}{0.3}-1\right)\right]^{0.3}}=363m/min [from(i)]

(b) Tool life,

T=\left[ \left(1+\frac{1.33}{0.667}\right)\left(\frac{1}{0.3}-1\right)\right]=7min [from(ii)]

(c) Cycle time:

T_c=T_h+T_m+\frac{T_t}{n_p}

T_m= \frac{\pi D l}{fV_{opt}}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 363}=0.53min/pc

n_p=\frac {7}{0.53}=13.2

\Rightarrow n_p=13 [ nearest lower integer]

So, the cycle time

T_c=2.5+0.53+\frac{1}{13}=3.11 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times3.11+\frac{1.33}{13}=\$2.18/pc

(e) Total time to complete the batch=2\times60+ {50\times 3.11}{50}=275.5 min=4.59 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times0.53}{275.5}=0.0962=9.62\%

Similarly, for the ceramic tool:

C_e= \$10/6=\$1.67/edge

T_t-1min

C= 3500 m/min

n=0.6

(a) Cutting speed:

V_{opt}= \frac {3500}{\left[ \left(1+\frac{1.67}{0.667}\right)\left(\frac{1}{0.6}-1\right)\right]^{0.6}}

\Rightarrow V_{opt}=2105 m/min

(b) Tool life,

T=\left[ \left(1+\frac{1.67}{0.667}\right)\left(\frac{1}{0.6}-1\right)\right]=2.33 min

(c) Cycle time:

T_c=T_h+T_m+\frac{T_t}{n_p}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 2105}=0.091 min/pc

n_p=\frac {2.33}{0.091}=25.6

\Rightarrow n_p=25 pc/tool\; life

So,

T_c=2.5+0.091+\frac{1}{25}=2.63 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times2.63+\frac{1.67}{25}=$1.82/pc

(e) Total time to complete the batch

=2\times60+ {50\times 2.63}=251.5 min=4.19 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times0.091}{251.5}=0.0181=1.81\%

3 0
4 years ago
Other questions:
  • Write a complete program that copies each character that is input from the keyboard and prints it to the screen, with the follow
    8·1 answer
  • Unlike in previous questions where we wanted you to complete a function we had started, here we want you to write a Python funct
    5·1 answer
  • A program is seeded with 30 faults. During testing, 21 faults are detected, 15 of which are seeded faults and 6 of which are ind
    12·1 answer
  • Write a naive implementation (i.e. non-vectorized) of matrix multiplication, and then write an efficient implementation that uti
    5·1 answer
  • Refers to the capability of a vehicle to begin moving forward on a specified grade.
    14·1 answer
  • Which of the following values is equivalent to the pound used by the U.S. customary system?
    10·2 answers
  • How to solve circuit theory using mesh analysis<br>​
    11·1 answer
  • Responding to the campaign of 4 classes, 7A, 7B, 7C, 7D contributed the amount of support proportional to the numbers 8,6;7;5 kn
    5·1 answer
  • How do cars moves? and explain Please.
    7·1 answer
  • The southernmost rim inlet elevation on the topographical survey is
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!