110 horses can be found in one day with 44 bales of hay. If each horse needs 2/5 bales of hay each day, just convert 2/5 into a decimal (0.4) and divide 44 by 0.4 to get 110. (That's a lot of horses!)
-6.7 and -8.8 and 11.(-2)
Paul can run 10m per 1 second
Steve can run 8.333m per 1 second
Answer: point estimate = 3.88
Margin of error = 0.63
Step-by-step explanation:
Confidence interval is written in the form,
(Point estimate - margin of error, Point estimate + margin of error)
The sample mean, x is the point estimate for the population mean. Let m represent the margin of error. Since the confidence interval is given as (3.25 , 4.51), it means that
x - m = 3.25
x + m = 4.51
Adding both equations, it becomes
2x = 7.76
x = 7.76/2
x = 3.88
Substituting x = 3.88 into x + m = 4.51, it becomes
3.88 + m = 4.51
m = 4.51 - 3.88
m = 0.63
Answer:
(2,-5) and (2,1).
Step-by-step explanation:
We need to find the find all the points having an x coordinate of 2 whose distance from the point (-2,-4) is 5.
A circle with center (-2,-4) and radius 5 represents all the points whose distance from the point (-2,-4) is 5.
Standard form of a circle is

where, (h,k) is center and r is the radius.


Now, put x=2.




Taking square root on both sides.




So, the y-coordinates of the points are -5 and 1.
Therefore, the required points are (2,-5) and (2,1).