Answer:
14
Step-by-step explanation:
Given that Steve invests in a circus production. The cost includes an overhead of $84,000, plus production costs of $2000 per performance. A sold-out performance brings in $8000.
Sales per performance =8000
Production cost per performance =2000
Contribution per performance = 
Overhead costs = 84000
Break even units = overhead cost/contribution per performance
= 
14 performances should be done to break even
The mess up occurs in one of the first things she says. She first claims that 7^2 +25^2 = 24^2
Wait a minute... slow your roll there.
25 is the hypotenuse, or the longest side of the triangle AND opposite the right angle (but we aren't supposed to know that yet).
The Pythagorean Theorem holds that a^2 + b^2 = c^2, where a & b are the legs of the triangle & c is the hypotenuse. So, she got the formatting correctly, but she switched 24 & 25.
Hope this helps!
I think its about 62 hours because you multiply the 185 days by 20 minutes and get 3,700 so you divide that by 60 and get 61.6666667. so the answer is 62 hours?
Answer:
x>3
Step-by-step explanation:
It will quarter the result. (I think so)