1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
faltersainse [42]
3 years ago
6

Point E has a positive y-coordinate.Where could point E be located on the coordinate plane?

Mathematics
1 answer:
poizon [28]3 years ago
4 0

Answer:

Either 1 or 2 quadrant

Step-by-step explanation:

If y = positive, it'll be on the top half of the graph!

You might be interested in
Give the algebraic expression by using variables and constant and arithmetic operations: i. Sum of the squares of x and y. ii.Pr
Olenka [21]

Answer:

a) x^2 + y^2

b) 9-xy

Step-by-step explanation:

Here, we want to write the algebraic statements as expressions;

a) The sum of the squares of x and y

The square of x is x^2

The square of y is y^2

The sum of the squares is x^2 + y^2

ii) Product of x and y subtracted from 9

The product of x and y is x * y = xy

Subtracting these from 9, we have;

9-xy

5 0
3 years ago
In the figures, ΔCDA ≈ ΔXYZ
Svetradugi [14.3K]
CD = XY = 26 mm
hope that helps
3 0
3 years ago
What is the volume that can fit exactly 128 cubes with 1/2 inch sides?
aleksandrvk [35]
I think it is 64 cause i  multiplied
8 0
3 years ago
jenny wrapped 30 gifts,jenny wrapped 5 times as many gifts as hong let n be the number of gifts that hong wrapped
Whitepunk [10]

n = 6

6 x 5 = 30

hope this helped, please mark brainliest. :)

7 0
3 years ago
Read 2 more answers
Before changes to its management staff, an automobile assembly line operation had a scheduled mean completion time of minutes. T
Sergio [31]

No, we don't have evidence to support that the mean completion time under new management has decreased but we can conclude that it remains at 15.5 minutes.

Given mean of 15.5 minutes , standard deviation of 1.7 minutes, sample size of 90 and sample mean of 15.4 minutes.

We can do the following study for conclusion:

Firstly the null hypothesis is

H_{0}: x=15.5

The alternate hypothesis is

H_{1}: x < 15.5

since the value is less than this is a one tailed test.

Z=x bar-x/d/\sqrt{n}

where x is sample mean and d is standard deviation.

Z=15.4-15.5/1.7/\sqrt{90}

=-0.1/1.7/9.4868

=-0.560

Critical value of Z at 0.1 level of significance

Z=-1.28

We fails to reject the null hypothesis since -0.560>-1,28

Hence we don't have evidence to support that the mean completion time under new management has decreased but we can conclude that it remains at 15.5 minutes.

Learn more about hypothesis at brainly.com/question/11555274

#SPJ4

Question is incomplete. It should include:

mean of 15.5 minutes ,

standard deviation of 1.7 minutes,

sample size of 90

and sample mean of 15.4 minutes.

5 0
2 years ago
Other questions:
  • What is the perimeter a square whose is 6.5 inches?
    11·1 answer
  • WILL GIVE BRAINLIEST A jewelry box is in the shape of a right rectangular prism with a length of 8.25 cm, a width of 5.5 cm, and
    10·2 answers
  • Sarafina had 34 out of 99 hits when she was at bat during the softball season what was her batting average
    10·1 answer
  • Express the following in exponential notation:<br> (-13) X (-13).<br> 35 times
    11·1 answer
  • - 2X +3Y=7<br> 5x+8y=-2<br> Solution=(_,_)
    9·1 answer
  • A box is a rectangular prism with a width of 24 inches and a height of 18 1/2 inches. The volume of the box is 10,656 cubic inch
    7·1 answer
  • Please help me with this
    11·1 answer
  • Somebody help me ASAP
    15·1 answer
  • A group of friends were working on a student film. They spent all their budget on costumes and equipment. They spent $396 on cos
    15·1 answer
  • Factor the following:<br> 1. x2+11x+30<br> 2. x2+22+121<br> 3. x2+x−30<br> 4. x2−7x−18
    11·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!