Answer:
p(on schedule) ≈ 0.7755
Step-by-step explanation:
A suitable probability calculator can show you this answer.
_____
The z-values corresponding to the build time limits are ...
z = (37.5 -45)/6.75 ≈ -1.1111
z = (54 -45)/6.75 ≈ 1.3333
You can look these up in a suitable CDF table and find the difference between the values you find. That will be about ...
0.90879 -0.13326 = 0.77553
The probability assembly will stay on schedule is about 78%.
The answer is C. Circle
Hope this helps :)
I’m pretty sure they both are functions
Mr. Vella can build the wall in 4 days, however only works on it for 3 days. That means that he has completed 75% of the and is leaving 25% for his apprentice.
We need to figure out how long it takes the apprentice to build 25% of a wall. We know he can build 100% of a wall in 6 days, so dividing 6 days by 4 will give us our answer.
6/4 = 3/2 = 1.5 days
It took the apprentice 1.5 days to finish the wall.
The formula for circumference is

.
To express the circumference exactly, plug the diameter in for

and put the

symbol in front of it. Don't multiply. This expresses the exact circumference.
Say you have the diameter of 17.
You can express the circumference with 17

.