Answer:
B.
Step-by-step explanation:
Green: y = 1.75x + 4
The slope is 1.75 which is the rate per mile.
Green charges $1.75 per mile.
White:
For 3 miles: $10.50
For 5 miles: $13.50
Difference: $13.50 - $10. 50 = $3.00
The $3.00 difference is for 2 miles.
Rate per mile: $3.00/2 = $1.50
White charges $1.50 per mile
Answer: B.
Answer:
Step-by-step explanation:
If you plot these points on a coordinate plane, you see that they are on the same horizontal line, y = 7, with the focus 1 unit to the right of the vertex. This means that the parabola is a sideways opening parabola, to the right, to be more specific. That means that it has the basic vertex form

where p is the distance in units from the vertex to the focus, h is the first coordinate in the vertex, and k is the second coordinate in the vertex. For us, p = 1, h = 6, and k = 7. Now we will just fill the vertex form of the equation in with our values:

We will solve this for x now by dividing each side by 4 and adding over the 6:

90 minutes or 1 hour and 30 minutes.
Hope this helps,
kwrob
Answer:
full arrow going left from 46
Step-by-step explanation:
Answer:
a is the _amplitude_(Length of the blades)_
The vertical shift, k, is the _Mill shaft height_


Step-by-step explanation:
In this problem the amplitude of the sinusoidal function is given by the length of the blades.

The mill is 40 feet above the ground, therefore the function must be displaced 40 units up on the y axis. So:

We know that the blades have an angular velocity w = 3 rotations per minute.
One rotation = 
1 minute = 60 sec.
So:


Finally:
a is the _amplitude_(Length of the blades)_
The vertical shift, k, is the _Mill shaft height_

