It can be changes and improved to peoples liking or just in a natural way. I hope that kinda helped
Answer:
8 more grams.
Explanation:
She has already eaten 152, so you'd multiply 40 and 4, to get 160.
So she would need to eat 8 more grams of protein.
Answer:
When reviewing your project requirements, it is important to bring your entire team together and review the project part by part along with all the individuals who will participate in it.
Explanation:
Requirements review is a very important step in starting a project. This is because it allows the project to be placed in a document and can be analyzed in a decomposed way. That is, the project leader will be able to analyze each part of the project and make specific notes, modifications and anything else that can reduce flaws and increase the project's capacity to obtain positive results. However, it is important that after this analysis, the leader brings all the project members together and shows them everything that was decided by reviewing the requirements.
Answer:
1) warm-up
2) muscular endurance
3) stretching
4) cardio-respiratory endurance
5) muscle strength
6) cool down
7) fun