Answer:
I got 1.75 too
Step-by-step explanation:
20/3.5 is 5.7
10/5.7 is 1.75
First we have to find the area. To do that, we first have to find the side lengths of the square. Since a square has all four sides same length, we can find this by dividing: 52/4 = 13
Now we'll find the area in square meters: 13 * 13 = 169
So the area is 169 square meters.
So to find out how much that will cost, we will multiply the number of square meters by the amount it cost per square meter: 169 * $5 = $845
So it will cost $845
Answer:
4 years
Step-by-step explanation:
need to see how many times 3000 can go in 24000 and count how many years tell u get 12000
hopes I helped
Answer:
n = 400
Step-by-step explanation:
The formula for the error in our estimate is given by:
Standard Error : √ ( p(1-p)/ n)
Error = SE = Zα/2 √ ( p(1-p)/ n) where
Zα/2= critical value for 95% confidence level = 1.96
and we know our error is 3.5 %
But we do not the sample proportion p. Then what we can do is give an estimate of p in the absence of any other information.
In this case we will use p= 0.5 which is the value that maximizes the expression for the standard error :
if p = 0.8 then SE= 0.040
p = 0.3 then SE =0.036
p = 0.1 then SE = 0.030
p = 0.5 then SE = 0.050
Substituting
3.5/100 = 1.96 x √ (( 0.5 x 0.5 ) /n )
3.5/ (100 x 1.96 x 0.5 ) = 1/ √n
0.0357 = 1 /√n
n = 20²
n = 400