Answer:
318 days or 10.6 months,
No, because the time between august and december is 8 months and it would take 10 to complete the tunnel
Step-by-step explanation:
start by determining the slope:
subtract the remaining distance from the total distance to determine distance so far, then divide by time.
m = (3200 - 1700)/5
m = 1500/5
m = 300
y = mx + b
Plug in to solve for x.
3200 = 300x + 0
3200 = 300x
divide y by m. This is x. (this is known as inverse operation if you didnt know already.)
3200 = 300(10.6_)
combine like terms on the left side. you always go from left to right.
Answer:
As y = mx + c (standard form)
Thus relating the equation , we get
m = 1
c = -6
In order for something to be a function, it has to pass the vertical line test, atleast in the standard coordinate plane. This is because a single x value can’t correlate with two separate y values. So the first one is not and the second one is
Answer:
The last option.
Step-by-step explanation:
Hope this helps!
Wait hold on