I set it up as a ratio with hours on the top and the fraction of the job on the bottom. It looks like this: 5/(2/3) / x/1, because 1 is the whole job if 2/3 is only a fraction of it. Cross multiplying gives you 2/3x = 5. Solving for x gives you that it will take 7.5 hours to complete a whole job if it takes 5 hours to complete 2/3 of it.
Answer:
Ok I look now what
Step-by-step explanation:
Let the two integers be x and x + 1, then
2(x + 1) + 9 = 3x
2x + 2 + 9 = 3x
3x - 2x = 11
x = 11
Therefore, the integers are 11 and 12.
34,590 because even if 0 engines are made, then 34,590 is still expected as a base price