Answer:
3:8
Step-by-step explanation:
If the ratio of red marbles to blue marbles is 8:3, and the question is asking for the ratio of blue marbles to red marbles, all you have to do is switch the numbers around.
The ratio of blue marbles to red marbles is 3:8
Hope this helps!
Answer:
a = 36 , b = 6
Step-by-step explanation:
expand the right side using FOIL and compare coefficients with like terms on left side.
(x - b)²
= x² - 2bx + b² , compare to x² - 12x + a , then
- 2b = - 12 ( divide both sides by - 2 )
b = 6
and a = b² = 6² = 36
Answer:

Step-by-step explanation:
The graph is in the image

Answer:
<em>Most likely time, </em>according to PERT (Program evaluation and review technique).
Step-by-step explanation:
PERT is "a statistical tool used in <em>project management" (Program evaluation and review technique (2020), </em>in Wikipedia), and it is commonly used with CPM <em>(Critical Path Method)</em> to manage projects.
Inside PERT, there are different defined times to accomplished an activity in a project, that is:
- An <em>optimistic time</em> or minimum time required to accomplished an activity, i.e., if everything goes better than normal, the activity is accomplished before expected.
- A <em>pessimistic time, </em>a time quite the opposite to optimistic time.
- A <em>most likely time</em>, or a time required to accomplished an activity if everything goes as expected or normally.
- An <em>expected time</em>, an statistical estimation.
Considering the question, we have that the <em>time</em> when "the first module of the project could be completed":
- "[...] in as few as 15 days" is the <em>optimistic time</em>.
- "[...] or could take as many as 25 days" is the <em>pessimistic time</em>.
- "[...] but most likely will require 20 days" is the <em>most likely time</em>.
As a result, the <em>20-day estimate</em> is called the <em>most likely time</em> in the context of the PERT/CPM techniques.