Answer:
Length of unpainted strip of each part of the road = 9 yard
Step-by-step explanation:
Total length of the road = 208 yard
When it is divided into 16 equal parts,
length of each part = 
= 13 yard
Mr.Ward paints 4 yard long strips in each part .That is he does not completely paint the part but paints only a small section of each part.
Length of unpainted strip of each part of the road = length of each strip - length of strip painted by Mr.Ward
Length of unpainted strip of each part of the road = 13 - 4
Length of unpainted strip of each part of the road = 9 yard
1. x/6 = 15 - 4
x = 11 × 6
x = 66
2. 2/7x = 3/14 - 1/7
2/7x = 3 - 2/14
2 = 7x/14
x = 4
3. 4+10 = x/2
14 × 2 = x
x = 28
Answer:
The probability is 0.0015
Step-by-step explanation:
We know that the mean
is:

The standard deviation
is:

The Z-score is:

We seek to find

The Z-score is:




The score of Z = 3 means that 7:15 p.m. is 3 standard deviations from the mean. Then by the rule of the 8 parts of the normal curve, the area that satisfies the conficion of 3 deviations from the mean has percentage of 0.15%
So

Hence, the correct answer is: C) (x - 6)^2 = 45
Further explanation:
Given equation is:

We will move the constant term on other side of the equation

To complete the square, we will take the coefficient of x and divide it by 2, as we already know that one term is x.

So, adding (6)^2 on both sides

Hence, the correct answer is: C) (x - 6)^2 = 45
Keywords: Quadratic Equation, Solution of equation
Learn more about quadratic equation at:
#LearnwithBrainly
Answer:
Modeling the dome as a hemisphere, V = 2/3 πr³ =
(2/3)(3.14)(54 ft)³ = 629,624.64 ft³
Step-by-step explanation: