Answer:
3(2+11) = 3x2 + 3x11
Step-by-step explanation:
The first thing any good mathematician does is convert the measurements to the same unit as what the question is asking. In this problem, it states that the pool fills at a rate of 20 cubic meters per hour. Just keep in mind that an hour is 60 minutes.
The next step is to see how many cubic meters will cost $300. This can be done by dividing 300 by 10. This gets you 30 cubic meters of water.
You already know that 60 minutes is 20 cubic meters of water. That leaves the remaining 10 cubic meters of water. By dividing the rate given, you get that 30 minutes is 10 cubic meters of water. Add the 60 and 30 together to get 90 minutes.
It will take 90 minutes for the pump to use $300.
Answer:
B.
Step-by-step explanation:
Not another one! ;)
A can be eliminated because the numbers don‘t match. B seems like a possible answer, let’s first check the others out. C and D can be slim instead because the variable, g, should be next to the 1.5 and 2.5. C and D both change the variable location. So, B.
y = -2 and x= 3
Graph is attached below. Black line is the graph of y=-2
Blue line is the graph of x=3
Whenever we get equation like x = something, in that case slope is always undefined
Whenever we get equation like y = something, in that case slope is always 0
y = -2 and x= 3
For x=3, the slope is undefined.
The graph of x=3 is a vertical line at 3 on x. The x intercept is 3 and there is no y intercept.
For y=-2, the slope is 0
The graph of y=-2 is a horizontal line at -2 on y. The y intercept is -2 and there is no x intercept.
We have the supplementary angles.
The sum of the measures of the two Supplementary Angles is 180°.
Therefore we have the equation:
13x - 2 + 39 = 180
13x + 37 = 180 <em>subtract 37 from both sides</em>
13x = 143 <em>divide both sides by 13</em>
<em>x = 11</em>
<h3>Answer: 11</h3>