1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Daniel [21]
3 years ago
9

Today I meant to look for my missing watch, but I could never find the time.

Engineering
2 answers:
belka [17]3 years ago
6 0

Answer:

the time in north america is 1:28

Explanation:

xxMikexx [17]3 years ago
5 0

Answer:

haha i get it

Explanation:

You might be interested in
The specific gravity of a substance that has mass of 10 kg and occupies a volume of 0.02 m^3 is a) 0.5 b) 1.5 c) 2.5 d) 3.5 e) n
zhuklara [117]

Answer:

Specific gravity is 0.5 so option (a) is correct option

Explanation:

We have given mass of substance m =10 kg

Volume V=0.02m^3

Density of substance is given by Density\ d=\frac{mass}{volume}=\frac{10}{0.02}=500kg/m^3

Specific gravity is given by specific\ gravity=\frac{density\ of\ substance}{density\ f\ water}=\frac{500}{1000}=0.5

So option (a) is correct option

5 0
3 years ago
1. Band saw lower wheel does not require a guard * true or false 2. Band saw upper guide should be adjusted to within 1/8" of th
Blizzard [7]

Answer:

1. Band saw lower wheel does not require a guard * true or false 2. Band saw upper guide should be adjusted to within 1/8" of the work piece * true or false 3. Find board & linear ft for 10 pieces of 4" x 4" x 8' *

4 0
2 years ago
In remote areas, your gps devices may lose reception. It’s a good idea to have a
Katarina [22]

Answer: MAP!!! it's always a good Idea to have a map nearby, cause you'll never know when you'll need it or like you said, lose reception

4 0
3 years ago
Read 2 more answers
Answer my question I will mark brainliest
Iteru [2.4K]

Answer:

150

Explanation:

Mark me Brainliest

6 0
3 years ago
Read 2 more answers
You are the project manager assigned to construct a new 10-story office building. You are trying to estimate the costs for this
Semmy [17]

Answer:

Bottom-up Estimation

Explanation:

Bottom-up estimation is a type of project cost estimation that considers the cost of individual project activities and finally sums them up or finds the aggregates. The summation gives an idea of what the entire project will cost.

This is an effective way of estimating the cost of a project as it evaluates the costs on a wholistic basis. It also considers the tiniest details during the estimation process. The process moves from the simpler details to the more complicated details.

8 0
3 years ago
Other questions:
  • The moisture in hot, humid, stagnant air surrounding a cold-water pipeline continually diffuses to the cold surface where it con
    14·1 answer
  • The market for college textbooks is illustrated in the graph below. In the market for textbooks, the current price of a textbook
    11·1 answer
  • When a user process is interrupted or causes a processor exception, the x86 hardware switches the stack pointer to a kernel stac
    13·1 answer
  • The price of a single item within a group of items is
    8·1 answer
  • which systems engineering support discipline has the goal to ensure that support considerations are an integral part of the syst
    14·1 answer
  • PLLLLLEEESSSEEE IIII NEED ASAP
    12·2 answers
  • PLEASE HELP!<br> I'm in the middle of a test and the teacher didn't go over the material!
    10·1 answer
  • Multilane roads use what to divide lanes of traffic moving in the same direction.
    14·2 answers
  • Does an electronic clock use electrical energy?​
    10·2 answers
  • Which one of the following best defines hardness: (a) energy absorbed by a material when an object strikes its surface, (b) resi
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!