There's an infinite number of ways we can rewrite 16 3/4, some of them being:
16 3/4
16 6/8
16 12/16
16 24/32
16.75
67/4
335/20
670/40
etc.
I hope it will help you ;)
4 inches = 1/3 foot
So the volume of that section is (150ft x 5ft x 1/3 ft) = 250 cubic feet
The whole trick to this question is knowing
how many cubic feet make 1 cubic yard.
1 yard = 3 ft
(1yd x 1 yd x 1yd) = 1 yd³
(3ft x 3ft x 3ft) = (3 ft)³ = (3)³ x (ft)³ = 27 ft³ <===
For the sidewalk project,
250 ft³ = (250 / 27) = 9.26 yard³ .
I think the way concrete contractors operate, they'll
want you to order and pay for 10 cubic yards.
Answer:

Step-by-step explanation:
The slope-intercept form of an equation of aline:

<em>m</em><em> - slope</em>
<em>b</em><em> - y-intercept</em>
The formula of a slope:

From the graph we have the points:
(-5, -5)
y-intercept (0, -2) → <em>b = -2</em>
Calculate the slope:

Put the value of the slope and the y-intercept to the equation of a line:

Answer: Median=16 Mode=16 and idk what the midrange is
Step-by-step explanation:For the median if you cross off the numbers from left to right until you have one number left in the middle.
Mode you need to look for the number that occurs the most which was 16.