Answer:
x^2-8x+16
Step-by-step explanation:
(x-4)^2
x^2-4x-4x+16
x^2-8x+16
Answer:
x3=y
Step-by-step explanation:
radius = diameter/2
so 28/2=14
using 3.14 for PI
2*3.14*14 = 87.92 = 88 inches
Answer:
b) 1.34
Step-by-step explanation:
The z score is used to determine the number of standard deviations by which the raw score is above or below the mean. If the z score is positive then the z score is above the mean while for a negative z score implies that it is below the mean. The z score is given by:

For the largest 9%, the score is 100% - 9% = 91% = 0.91
From the normal distribution table, the z score that corresponds to 0.91 is 1.34
Answer:
True
Step-by-step explanation:
Assemble line is a production process in which parts are joined to the products produced as a partially finished product.
Here the process flow is discreet that is assembled one at a time.
Continous process flow is a type of manufacturing products without disruption of the flow process.
As the name implies,it is continous.