Assuming the price of the pool does not change, then
Additional interest required is 4500-3750=750
using
I=Pit, we set up equation
750=3750*0.055*t
Solve for t
t=750/(3750*0.055)=3.64 years.
So will need to wait 3.64 years, or rounded up to 4 years.
Answer:
(2) 2,640 ft
Step-by-step explanation:
I'm going to assume that in this question, you are walking 1 full circle around the reservoir. That would mean you need to calculate the circumference of the circular reservoir.
The circumference formula is:
C = ⫪d
C stands for Circumference
d stands for diameter
I will use 22/7 instead of pi, so the formula looks more like this:
C = (22/7)(d)
The diameter is 840 feet, so we will substitute the variable d with 840:
C = (22/7)(840)
You can plug this part into the calculator, but by hand, it'll look something like this:
(22/7)*840 = (22*840)/7
18,480/7 = 2.640
Hope it helps (●'◡'●)
Answer:
we plot first the data and find the equation. The equation is c(x) = 7x2 - 3x + 5. when x is equal to 5, then c(x) is equal to $165
Step-by-step explanation:
Answer:
The speed of the first train is 45 mph and the speed of the second train is 75 mph
Step-by-step explanation:
Let x represent the speed of the first train in mph. Since the second train, is 30 mph faster then the first, therefore the speed of the second train is (x + 30).
The first train leaves at 1:00 pm, therefore at 6:00 pm, the time taken is 5 hours. Therefore the distance covered by the first train at 6:00 pm = x mph * 5 hours = 5x miles
The second train leaves at 3:00 pm, therefore at 6:00 pm, the time taken is 3 hours. Therefore the distance covered by the second train at 6:00 pm = (x + 30) mph * 3 hours = (3x + 90) miles
Since the second train overtakes the first at 6:00 pm, hence:
3x + 90 = 5x
2x = 90
x = 45
Therefore the speed of the first train is 45 mph and the speed of the second train is 75 mph (45 mph + 30 mph).
41.40 ÷ 12 = 3.45
So if you are buying a yearly subscription it is $3.45 per issue.
4.25 - 3.45 = 0.8 that is how much you save.