Answer:
c. just a few weeks to install.
Explanation:
ERP is known as Enterprise Resource Planning.ERP implementation involves software installation, transfer of the financial data to the new system, configuration of the users and processes and training the users on the software.
It also involves upgrades after installation,cross-functional teams, intensive training, high funding for both initial cost and maintenance. This whole process usually takes place between 6 months to 2 years. This makes option C which says it takes few weeks to install incorrect.
The execution speed of machine language is faster than the execution speed of other languages. Machine or assembly language will execute the fastest as compared to high-level languages. No other language can execute faster than Machine language since instructions are directed straight to the CPU. Other high-level languages often add some non-zero amount of overhead to the execution time, thus, causing some delay.
Answer:
A weak fuel to air mixture along with normal airflow through a turbine engine may result in <u>a lean die out</u>.
Explanation:
Lean die out is a type of problem that may occur in the turbine. This may result in the weak fuel to air mixture. In case if the mixture of fuel and air is getting low due to some reasons like leakage of gas or low speed of engine may result in dangerous conditions such as fire or blast in the turbine. This is called lean die out. In the result of this problem, the turbine can be burn with the blast and may leads to causalities.
Answer:
Quality Of Service
Explanation:
Technology that manages data traffic to reduce packet loss, latency and jitter on the network. QoS controls and manages network resources by setting priorities for specific types of data on the network.
1. non photorealistic rendering
2. siftables
3. spherical audio
4. blu ray