Answer:
either 5 or 6 months
Step-by-step explanation:
Tom M Jerry
500 1 125
475 2 175
450 3 225
425 4 275
400 5 325
375 6 375
Answer:

Step-by-step explanation:
Let's call y the number of patients treated each week
Let's call x the week number.
If the reduction in the number of patients each week is linear then the equation that models this situation will have the following form:

Where m is the slope of the equation and b is the intercept with the x-axis.
If we know two points on the line then we can find the values of m and b.
We know that During week 5 of flu season, the clinic saw 90 patients, then we have the point:
(5, 90)
We know that In week 10 of flu season, the clinic saw 60 patients, then we have the point:
(10, 60).
Then we can find m and b using the followings formulas:
and 
In this case:
and 
Then:


And


Finally the function that shows the number of patients seen each week at the clinic is:

1/100 of 605 is 6.05 because you divide 605 by 100
1 7/9 divided by 2/9 is 8 hunny hope it helps ^_^
Answer:
The answer is:
30 minutes.
Step-by-step explanation:
We are given the following information:
at 160 m/min, tool life = 5 min.
at 120 m/min, tool life = 17 min.
This means that as the speed reduced from 160 m/min to 120 m/min, the tool life increased from 5 min. to 17 min, hence the difference between the changes are:
speed = 160 - 120 = 40 m/min
tool life = 17 - 5 = 12 min.
Therefore, it can be concluded that a change of speed of 40 m/min, increases the tool life by 12 min.
40 m/min = 12 min
∴ 1 m/min = 12/40 min.
∴ 100 m/min = 12/40 × 100 = 0.3 × 100 =30 min.