Answer:
The number of viewers Network A expects will watch their show is 1.4 million viewers.
Step-by-step explanation:
The expected value is calculated by multiplying the possible outcomes by the probability of their occurrence and adding the results
Therefore, we have the expected value given by the following expression;
Estimated network A viewers where network B schedule top show = 1.1 million viewers
Estimated network A viewers where network B schedule a different show = 1.6 million viewers
Probability that Network B will air its top show = 0.4
Probability that Network B will air another show = 0.6
We therefore have;
Expected value, E of Network A viewers is therefore;
E = 1.1 × 0.4 + 1.6 × 0.6 = 0.44 + 0.96 = 1.4 million viewers.
Network A expects 1.4 million viewers will watch their show.
C multiply 1/2 by 10 and 1/5 by 2
Answer:
you use older of operations to solve this
Answer:
1/7 (option d) of the sensors on the satellite have been upgraded
Step-by-step explanation:
Each unit contains the same number of non-upgraded sensors
number of non-upgraded sensors for each module (nus)
total number of upgraded sensors on the satellite (tus)
satellite is composed of 30 modular units
total number of non-upgraded sensors on the satellite (tnus):
tnus=30*nus
total number of sensors on the satellite (ts):
ts=tnus+tus = 30*nus + tus (I)
The number of non-upgraded sensors on one unit is 1/5 the total number of upgraded sensors on the entire satellite
nus=(1/5)*tus
tus = 5 * nus (II)
Fraction of the sensors on the satellite have been upgraded (FU):
FU = tus/ts
Using I and II
FU= (5* nus)/(30*nus + tus)
FU = (5* nus)/(30*nus + 5 * nus)
FU = (5* nus)/(35*nus)
FU = 1/7
1/7 (option d) of the sensors on the satellite have been upgraded