Answer:
83.4% or 83%
Step-by-step explanation:
when trying to find a percent, divide the numerator (# of correct answers) by the denominator (# of total questions possible to get correct)
Which would be 16.67 divided by 20 which equals .8335. Move the decimal point over two placements which would be 83.35. I rounded it up to 83.4. If trying to find a whole number not a decimal it would be 84%. Depending on the grading scale, it would be a B.
Answer:
the answer is 15.
Step-by-step explanation:
Answer: d
Step-by-step explanation:
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
Answer:
x = 8
Step-by-step explanation:
Step 1: Subtract 5x from both sides.
Step 2: Add 2 to both sides.
Step 3: Divide both sides by 2.
Step 4: Check if solution is correct.
Therefore, x = 8.