Answer:
The time required to finish the work by both candy and Tim working together = 36.83 minute
Step-by-step explanation:
Time taken by the candy to finish the work
= 85 min
Time taken by the Tim to finish the work
= 65 min
Thus the time taken by both to finish the work = 
Put the values of
and
we get ,
= 
= 
= 36.83 minute
Thus the time required to finish the work by both candy and Tim working together = 36.83 minute
It is 6 units because you find the absolute value of the two different coordinates, in this case it is 4 and -2. Since they belong in different quadrants (one x or y value is positive and the other is negative) you add them. If they are both in the same quadrant, you subtract them.
Answer:
The domain would be given by <u>D = {X ≥ 2} X = [2, Z].</u> Since the variable Z is the number of children in the school. And the 6 children should not survey the same person, it would be Z / 6 for each interviewer.
Step-by-step explanation:
- If the group of children surveys more than 2 classmates, it means that the number with which the survey begins is 12 students.
And since the maximum number of students in the school is given by the variable of Z, then Z is the number with which the domain closes.
The rank would be given by the set of [2, Z]
Z / 6 being the maximum number of children surveyed by 1 interviewer.
Answer:

Step-by-step explanation:
We first translate the statement into an equation:

Then we simplify:

Answer:
x=4√5
y=12
z=6√5
is your answer look it once