Blue triangle: perimeter is 4x+2+7x+7+5x-4, or, after simplification,
16x + 5
Red triangle: perim. is 2x-5+x+7+x+3 (and so on).
Answer:Production rate = 4.56 x 10³ bulbs/week
Production time = 9.36 x 10² weeks
Number of bulbs produced is
Answer: 4.27 x 10⁶ bulbs
Step-by-step explanation:
I wish i remembered that but it has been a while
You are told that sprinklers run for the same amount of time. lets refer to this time as T.
you are told that 4 sprinkles run one at a time for 50 minutes total. that means that T should be 50/4 = 12.5 minutes = 12 minutes and 30 seconds
If you say 3.5 times 30 ur answer would be 105