Answer:
(12.2,-6.4)
Step-by-step explanation:
The results from Desmos are as shown.
The displayed values are (12.294, -6.353)
Hello!
The words at least means that the worker needs to work 8, 9 or 10 hours. We can add probabilities, so we will add .6 (for those working 8 hours), .15 (for those working 9 hours) and .08 (for those working 10 hours) to get a total probability of .83.
Hope this helps!
Answer:
Option D is the correct answer.
Step-by-step explanation:
Let x be the one way distance and t be the time out.
Time taken for back = t-1
We have plane's average speed out was 300 mph and average speed on the way back was 350 mph.
That is

Dividing both equations

Time taken for back = t-1 = 7-1 = 6 hours.
Total time taken = 7 + 6 = 13 hours
Option D is the correct answer.
Answer:
11°
Step-by-step explanation:
tan ∅ = 20/100 = 0.2
∅ = 11.31°
Slope intercept is y=mx+b
m=slope
slope if found by
m=(y1-y2)/(x1-x2)
(x,y)
(-1,-2) and
(1,2)
x1=-1
y1=-2
x2=1
y2=2
m=(-1-1)/(-2-2)
m=-2/-4
m=1/2
y=1/2x+b
solve fo by subsituting one x value
(1,2)
x=1
y=2
2=1/2(1)+b
2=1/2+b
subtract 1/2
3/2=b
equation is
y=1/2x+3/2