Answer:
48 MPH
Step-by-step explanation:
10 mins times 6= 60 mins which is an hour
8 miles times 6= 48 miles
This means the average is 48 MPH
42.8 in
Step-by-step explanation:
Step one:
given data
we are told that the expression for the depth of a lake after x years is given by
Required
The value of y when x= 4
Step two:
substitute the value of x in the expression to get y
After 4 years the depth will increase by 42.8 in
Answer:
Labor costs $205 per hour.
Step-by-step explanation:
1. Subtract the cost for parts.
$417.50 - $155 = $262.5
2. Divide the labor cost by the number of hours (2.5)
$262.5 / 2.5 = 105
The answer is C. $95.83. To get the answer, you need to
convert all units into yard first. Then, multiply all the given numbers having
a result of 2.0827 cubic yards. Lastly, multiply the result to the concrete
cost of $46. So the cost to pour a slab for a patio is $95.83.