Answer:
d. It highlights uncertainty in project duration
Explanation:
The acronym PERT stands for Program Evaluation and Review Technique. It is method that is used to determine the tasks or activities that are scheduled and examines how much time is required to complete each activity. It is used in project management to determines the minimum time required to complete the whole project.
Despite its highly usage in determining the time required to complete a project, it provides several limitations to its practical use. Like it can provide correct information about the accuracy of one element of any three estimates. It also does not provide the information when exactly a third scheduled task can begin before the accomplishing the two ongoing activities.
Thus the correct answer is--
d. It highlights uncertainty in project duration
Answer:
1. the 0.2 kg ball was hit with 4N of force, which caused it to accelerate 20 meters per second, per second.
2. Force = (mass x acceleration) = 18 x 3, = 54N.
3. So the force exerted by the wind on the paper cup is 0.125N
4. So the force exerted by me is 200N
5. you will need 280N of force
6. 88N
7. 0N
answers are in bold
Answer:
Georgia the state not the country
Explanation:
<span>brain drain.
It is the departure of educated or professional people from one country, economic sector, or field for another usually for better pay or living conditions.</span>