Since, AB and BC are the same length, the measure of the chord for BC would be 12.5 units
Answer : 58 square units.
Tip : break the shape down into shapes you can easily find the area of.
I found the area of the two squares on the bottom
They are identical and are both 2 units tall and two units long giving, giving an area of 4, and since there are two of them you can multiply the are by two giving you 8
Next found the area of the remaining shape which is just a rectangle that excludes the two bottom squares which is 10 units long and 5 units tall multiplying to 50
50+8=58
Total cost job=
Retail price of parts+labor cost+manufacturing overhead
Total cost job 82
Retail price of parts 0
Labor cost=7.5×6.5=48.75
Manufacturing overhead ?
82=0+48.75+?
?=82−48.75
?=33.25
Manufacturing overhead is 33.25
Now find manufacturing overhead rate from the cost of labor
33.25÷48.75=0.682×100=68.2%
The answer 68.2%
Answer: $9.45
Step-by-step explanation:
Divide 59.70 by 6
59.70/6
9.45
m=$9.45
You have to find out how much time she played on Saturday, Wednesday, Friday, and Sunday. Let's look at the facts.
Sunday: No info is given.
Friday: She played the least of all four days
Saturday: Twice as much as Wednesday
Wednesday: No info is given.
We can write a problem and solve from this information. Let's use the variable W for Wednesday. Saturday is 2W. So whatever number Wednesday has, multiply it by 2. All of the total numbers should equal 10.
Since Friday was played the least amount, we know that every other day has to be at least 2 hours or above, so that Friday can be 1 hour. Sunday we have no info given.
This is a bit of guess and see for this problem. Let's say that Friday was 1 hour, Wednesday was 2, Sunday was 3, and Saturday was 4. Total that equals 10. Let's check to varify that these numbers are correct.
Friday was the least amount of hours of any day, which is why it is 1.
Wednesday had 2 hours, and Saturday had twice that many, which is 4.
Sunday has 3 hours.
In short, your answer would be: Friday 1 hour, Wednesday 2 hours, Sunday 3 hours, and Saturday 4 hours. I hope I explained it wel