Answer:
Function A has a rate of change of 5 and Function B has a rate of change of 4.5. Thus, Function A has a higher rate of change
Step-by-step explanation:
2/3 is your answer to the question
Answer:
1. 24 km/hour
2. 48 km
Step-by-step explanation:
1 mile = 1.6 km
cyclist = 15 miles/ hour
we want to multiply speed by something that will cancel miles out and leave km. to do this, we want to multiply it by something with miles on the bottom and km on the top.
this is because
miles * km / miles = km as the miles cancel out and km is left in the numerator
thus,
1 mile = 1.6 km
divide both sides by 1.6 km to get 1 on a side
1 mile / 1.6 km = 1
alternatively, divide both sides by 1 mile to get 1 on a side
1.6 km / 1 mile = 1
since we want miles on the bottom, we choose the second option
cyclist = 15 miles / hour = 15 miles/hour * 1 = 15 miles/hour * 1.6km / 1 mile = 24 km /hour
24 km/hr for 2 hours = 24 km/hr * 2 hours = 24 * 2 km = 48 km
10lb. of jam needs 5lb. apple, or 2lb. of jam needs 1lb. apple.
Now we want 8lb. of jam.
Set up a proportion:
2/1=8/x
Solve for x by cross-multiplying.
2x=8
x=4 lb. of apple
Answer:
32
Explanation:
Since you're looking for the 4th term in the sequence, go ahead and replace the <em>n</em> with 4:

which is equal to

which is

and that is 32