Answer:
14(26+53)
Step-by-step explanation:
14*26 + 14*53 can be rewritten as 14(26+53). The value of this expression is 14(79) = 1106.
Answer:
1.65 per kg
Step-by-step explanation:
Answer:
0.055
Step-by-step explanation:
file is attached with explanation
A and b can do a piece of work in 12 days. If a alone have to finish the job among b and c so
A and b=12
A (24 days alone without b)
So if b and c 15 days and c 20 days. If a have to do all I would add 24 and 15 and 20 which would be 59 days