rewona [7]
3 years ago
9

What is the volume of a sphere with a radius of 6in? Round to the nearest hundredth. Remember V = 4/3πr3 * 20 points 457.86 inch

es cubed 394.56 inches cubed 904.78 inches cubed 807.78 inches cubed
Mathematics
1 answer:
kakasveta [241]3 years ago
7 0

Given:

The radius of the sphere is 6 in.

To find:

The volume of the sphere.

Solution:

We know that, the volume of a sphere is

V=\dfrac{4}{3}\pi r^3

Where, r is the radius of the sphere.

Putting r=6, we get

V=\dfrac{4}{3}\pi (6)^3

V=\dfrac{4}{3}\pi (216)

V=288\pi

V\approx 904.78

The volume of the sphere is 904.78 inches cubed.

Therefore, the correct option is C.

You might be interested in
Which of the following values is the solution to the equation -35x = -105 ? 3 -3
Nikolay [14]

Answer:

3

Step-by-step explanation:

it will be 3 if you want to find the positive number

3 0
3 years ago
Plzz help me im am stuck
Pachacha [2.7K]
I hope this helps you!

7 0
3 years ago
It takes 15 electricians 24 days to wire a new housing subdivision. how many days would 18 electricians require to do the same j
Romashka [77]
15 electricians worked for 24 days to the whole job, now, there are 15 of them, so on any given day, each electrician worked one whole day, in 24 days, that one electrician worked 24 days total.

now, there were 15 electricians on any given day though, since each one of them worked the whole day that one day, so the "days work worth" on a day is 15, so the house gets 15days worth of work because of that.

so how many "days worth" did all 15 do on the 24 days, well, 15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15, namely 15 * 24, or 360 days worth of work.

since it takes 360 days worth of work to do the whole wiring, in how many days would 18 electricians do it?   360/18.
4 0
3 years ago
Read 2 more answers
The temperature has been going down at a constant rate. In 4 hours it went down 12 degrees. Which expression best shows the temp
Ganezh [65]
I believe -3t is the answer.
5 0
3 years ago
Suppose you have 15 muffins. How many muffins are left after you give a friend 1/3 of them?
madam [21]
You would have 10 muffins left because 1/3 of 15 is 5 so 15-5=10
5 0
3 years ago
Read 2 more answers
Other questions:
  • Use the graph to state the solution for the system.
    14·1 answer
  • Wayne and Winston are scuba diving and are ascending to the surface. The function y = 30x − 105 represents Wayne’s elevation in
    10·2 answers
  • What is decimal for 2 7/10
    8·2 answers
  • What is the length of side BC of the triangle? Enter your answer in the box. units Triangle A B C with horizontal side B C. Vert
    9·1 answer
  • What is 2.48 as a whole number
    5·2 answers
  • Simplify 3(12 - 8) + 5
    10·2 answers
  • Can someone answer this question please
    13·2 answers
  • What is 2/5 ÷ 2/3 i need help
    7·2 answers
  • What is the perimeter of the<br> figure below?<br> 2 in<br> 9 in<br> 2 in
    9·1 answer
  • If jane has 3 pars and take 3 pars how many pars would she had left
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!